Mt. Charleston Weather

Current Weather, Forecast, and Live Webcam for Mount Charleston, NV

Current Mt. Charleston Road Conditions, Advisories and Snow Chain Requirements

Last Updated on August 20, 2014 at 11:17 pm.
SR 156 - Lee Canyon Road: See Below

SR 157 - Kyle Canyon Road: See Below

SR 158 - Deer Creek Road: OPEN

Weather  Weather Related ...DRY CONDITIONS WITH GUSTY WINDS ON FRIDAY... ...FIRE WEATHER WATCH IN EFFECT FROM FRIDAY MORNING THROUGH FRIDAY EVENING FOR GUSTY WINDS AND LOW HUMIDITY FOR EXTREME NORTHEASTERN CALIFORNIA AND NORTHWEST NEVADA... THE NATIONAL WEATHER SERVICE IN RENO HAS ISSUED A FIRE WEATHER WATCH FOR GUSTY WINDS AND LOW HUMIDITY...WHICH IS IN EFFECT FROM More Details
Weather  Weather Related ...DRY CONDITIONS WITH GUSTY WINDS ON FRIDAY... ...FIRE WEATHER WATCH IN EFFECT FROM FRIDAY MORNING THROUGH FRIDAY EVENING FOR GUSTY WINDS AND LOW HUMIDITY FOR EXTREME NORTHEASTERN CALIFORNIA AND NORTHWEST NEVADA... THE NATIONAL WEATHER SERVICE IN RENO HAS ISSUED A FIRE WEATHER WATCH FOR GUSTY WINDS AND LOW HUMIDITY...WHICH IS IN EFFECT FROM More Details
Road Condition East Winnemucca BlvdOversized Load There is a conditions related event (Oversized Load) convoy of three in the travel lane with pilot car on Thursday August 21st from junction Haskell St on East Winnemucca Blvd to junction I-80-Exit 180 in Winnemucca, Humboldt County Nevada. Estimated End Time is 7:15 PM on 08/21/14
Road Condition Grass Valley RdOversized Load There is a conditions related event (Oversized Load) a convoy of three in the travel lane with pilot car on Thursday August 21st from Exit 168-Rose Creek to Airport Road, Westmoreland St, on Grass Valley Rd North East to Haskell, and junction SR794-Winnemucca Blin Winnemucca, Humboldt County Nevada. Estimated End Time is 7:15 PM on 08/21/14
Road Condition i 80Oversized Load There is a conditions related event (Oversized Load) on i 80 East in Pershing County Nevada. Starting Tuesday August 19 at 0530 from Oreana, NV on i80 exit 119/Oreana Rochester, Eastbound 1-80, Exit 168/Rose Creek, Airport rd, Westmoreland, Grass Valley rd, Haskell, SR 794/Winnemucca blvd, Exit 180/Easet Winnemucca, i80, Exit 231/SR 305, US50, SR278,SR221/Chestnut, Old 40 Frontage rd, (102) Rolling Thunder way, Carlin, NV Estimated End Time is 8:30 PM on 08/25/14
Construction I-15Overnight Roadwork There is construction (Overnight Roadwork, Minor Delays) on I-15 northbound between SR-146 Saint Rose Parkway and Silverado Ranch reduced to 1 lane nightly 9pm to 5am - Aug 18th thru Aug 20th - expect delays in Las Vegas, Clark County Nevada. Estimated End Time is 5:30 AM on 08/21/14
Construction I-15Roadwork There is roadwork and major delays in both directions on I-15 from the Dry Lakes Area (mile marker 69.0) to I-15 Exit 93 - SR 169 Logandale Overton due to road construction and paving. One lane will be closed in both directions Monday through Friday 6am-4pm excluding holidays in Las Vegas and the Overton/Logandale areas, in Clark County Nevada. Estimated End Time is 6:14 PM on 02/27/15
Construction I-15Roadwork Contract 3546: Roadwork, Minor Delays on I-15 in both directions from milepost 69 (5 miles north of US93 Great Basin Highway) to milepost 95 (north of SR169 Moapa Valley Blvd) in Glendale, Clark County Nevada.
Construction I-15Bridge Work (Contract 3530R) - Cactus Bridge Construction: Bridge Work, Minor Delays on I-15 in both directions from St. Rose Parkway to Silverado Ranch due to paving and roadway construction. Please expect traffic delays or use alternate routes in Las Vegas, Clark County Nevada.
Construction I-15Roadwork Roadwork on I-15 Northbound going into Arizona; construction starts at mm 13.0 (Arizona) which is approximately 15 miles north of Mesquite, Nevada. I-15 will be narrowed to one lane of travel in each direction at two Arizona bridge construction points. Use caution and expect delays in Mesquite, Clark County Nevada, and while travelling northbound out of Nevada into Arizona on I-15. Construction begins on January 6, 2014 and will end summer 2014.
Construction I-580Overnight Roadwork There is construction (Overnight Roadwork, Bridge Work) in Nevada. Traffic will be reduce to one lane I-580 NB and SB with speed reduce to 55 MPH. The #1 and #2 SB lanes will be closed and #2 and #3 NB lanes closed. This is for Agreement number P318-14-201; Bridge repairs on Structure H-1247 Peckham Lane Grade separation. Estimated End Time is 6:00 AM on 08/22/14
Road Condition I-80Oversized Load There is a conditions related event (Oversized Load) on I-80 East in Nevada. Super load movement starting August 21 entering i 80 at Oreanna exit 119 and continuing Eastbound i-80, Exit 168/Rose Creek, Airport rd, Westrmoreland, Grass Valley road, Haskell, SR 794/Winnemucca blvd., Exit I 80 East Winnemucca, I 80, Exit 231 SR 305, US 50, SR 278, SR 221/Chestnut, Old 40/Frontage road, (102) Rolling Thunder Way, Carlin, NV Daylight hours only, Wednesday August 20 thru Friday August 22 and Monday August 25 (only if necessary) Estimated End Time is 8:30 PM on 08/25/14
Road Condition I-80Oversized Load There is a conditions related event (Oversized Load) convoy of three in the travel lane with pilot car on Thursday August 21st from junction Exit 180 in Winnemucca on I-80 East to junction SR-305 in Battle Mountain in Nevada. Estimated End Time is 7:15 PM on 08/21/14
Road Condition I-80Oversized Load There is a conditions related event (Oversized Load) convoy of three in the travel lane with pilot car on Thursday August 21st from Exit 119-Oreana-Rochester on I-80 East to Exit 168-Rose Creek in Nevada. Estimated End Time is 11:33 PM
Construction I-80Roadwork There is construction (Roadwork) and Striping on I-80 in both directions from milepost 75 to milepost 62 in Pershing County Nevada, daily beginning at 6am until 4:30pm. Estimated End Time is 4:30 PM on August 21.
Construction I-80Roadwork There is construction (Roadwork) on I-80 in both directions with lanes reduced to 1 from milepost 213 to milepost 217, daily beginning at 7am until 4pm in Humboldt County Nevada. Estimated End Time is 4pm on August 21.
Construction I-80Roadwork There is construction (Roadwork) on I-80 in both directions with lanes reduced to 1, speed limit 55mph, width limit 14ft. and up to a 10 minute travel delay from milepost 193 to milepost 206 in Humboldt County Nevada. Estimated End Time is 6pm on August 31.
Construction I-80Roadwork There is construction (Roadwork, Bridge Work) on I-80 in both directions with lanes reduced to 1; width limit 14ft; speed limit 55mph; travel delay 10 minutes from milepost 163 to milepost 179.5 in Humboldt County Nevada. Estimated End Time is 6pm on August 31.
Construction I-80Roadwork There is construction (Roadwork, Bridge Work) on I-80 in both directions with flaggers and on ramp closed; no passing; routing to opposing lanes; lanes reduced to 1; width limit 14 feet; speed limit 55mph, Eastbound traffic will crossover to the Westbound side for 4 miles from milepost 254 at Dunphy to milepost 261 at the Beowawe Interchange.Estimated End Time is 8:30 PM on August 29th.
Construction I-80Roadwork There is construction (Roadwork, Bridge Work) on I-80 in both directions with flaggers; lanes reduced to 1; no passing; width limit 14 feet; speed limit 55mph from milepost 258 to milepost 267 at Emigrant and on the Dunphy Frontage Road from Junction IR80 to milepost 3.84 in Eureka County Nevada. Estimated End Time To Be Determined.
Construction I-80Bridge Work There is construction (Bridge Work) on I-80 in both directions from milepost 285 to milepost 288 at the Carlin Tunnels with lanes reduced to 1; no passing; width limit 14ft.; speed limit 55mph; travel delay 5 minutes; detour length 2 miles in Elko County Nevada. Estimated End Time is 5:00 PM on 10/31/14
Construction Martin Luther King BlvdRoadwork Roadwork on Martin Luther King Blvd in both directions in Las Vegas, Clark County Nevada.
Construction SR 445Roadwork There is construction (Roadwork) on SR 445 in both directions in Washoe County Nevada. Roadway being reduced to one lane. Pilot car present and 30 minute delays possible. No passing. Estimated End Time is 6:00 PM on 08/22/14
Construction SR-140Roadwork There is construction in Nevada in Humboldt County from milepost 52 through milepost 53 in the ditch. Estimated End Time is 3:30 PM
Construction SR-156 Lee Canyon RoadRoadwork There is construction (Roadwork) on SR-156 Lee Canyon Road in both directions at the roundabout - ongoing concrete pavement work thru Aug 28th - use caution around flaggers as needed - expect delays in Clark County Nevada. Estimated End Time is 7:00 PM on 08/28/14
Construction SR-157 Kyle Canyon RoadRoadwork There is construction (Roadwork) on SR-157 Kyle Canyon Road eastbound beginning at mile marker 5 - paving 1 mile sections at a time Aug 20th thru Aug 28th at 6am - 4pm ; use caution in area of flaggers & pilot car escort - expect delays in Clark County Nevada. Estimated End Time is 7:00 PM on 08/28/14
Construction SR-207Overnight Roadwork There is construction (Overnight Roadwork) on SR-207 in both directions from US 50 to Tramway Drive in Douglas County Nevada. August 18 to August 29 6 pm to 530 am. Lane closures with flaggers routing to opposing lanes. Consider alternate route. Due to access issues in some locations will be short daytime lane closures. Estimated End Time is 5:30 AM on 08/29/14
Road Condition SR-221Oversized Load There is a conditions related event (Oversized Load) convoy of three in the travel lane with pilot car on Thursday August 21st from junction SR-278 on SR-221 Chestnut St East to junction Rolling Thunder Way in Carlin, Elko County Nevada. Estimated End Time is 7:15 PM on 08/21/14
Construction SR-225Roadwork There is construction (Roadwork) on SR-225 in both directions in Elko County Nevada from milepost 96 through milepost 100; pilot car; flaggers; 30 minute delay. Estimated End Time is 3:30 PM on 08/21/14
Construction SR-225Overnight Roadwork There is construction (Overnight Roadwork) on SR-225 in both directions with right turn lane closed ,flaggers, lanes reduced to 1, speed limit 35 mph, from Idaho Street to Cattle drive, nightly, Sunday through Thursday from 7pm to 6am in Elko, Elko County Nevada. Estimated End Time is 12:00 AM on 10/31/14.
Construction SR-227Roadwork There is construction (Roadwork) on SR-227 in both directions with lanes reduced to 1, speed limit 45mph, width limit 14ft., from 12th Street to Junction SR228, daily, Monday through Friday from 6am to 6pm in Elko, Elko County Nevada. Estimated End Time is 12:00 AM on 10/31/14
Construction SR-227Overnight Roadwork There is construction (Overnight Roadwork) on SR-227 in both directions with right turn lane closed, flaggers, lanes reduced to 1, speed limit 35mph, width limit 14ft., from Idaho Street to 12th Street, nightly, Sunday through Thursday, 7pm to 6am. in Elko, Elko County Nevada. Estimated End Time is 12:00 AM on 10/31/14
Construction SR-229Roadwork There is construction (Roadwork) on SR-229 in both directions with pilot car and flaggers; routing to opposing lanes and no passing; width limit 12 ft. from milepost 21 to milepost 37, Monday through Friday from 6am until 6pm in Elko County Nevada. Estimated End Time is Friday August 22.
Road Condition SR-278Oversized Load There is a conditions related event (Oversized Load) convoy of three in the travel lane with pilot car on Thursday August 21st from junction US-50 in Eureka on SR-278 north to junction SR-221 Chestnut St in Carlin in Nevada. Estimated End Time is 7:15 PM on 08/21/14
Road Condition SR-305Oversized Load There is a conditions related event (Oversized Load) convoy of three in the travel lane with pilot car on Thursday August 21st from junction I-80 in Battle Mountain on SR-305 South to junction US-50 in Austin, Lander County Nevada. Estimated End Time is 7:15 PM on 08/21/14
Construction SR-305Utility Work There is construction (Utility Work) on SR-305 Northbound, on the shoulder; beginning at 7am to 5pm, daily, Monday through Friday, in Lander County Nevada. Estimated End Time is 5:00 PM on 08/29/14
Special Event SR-341Parade There is a special event (Parade) on SR-341 in both directions in Storey County Nevada. Clsoed from 4th Ward School to Sutton street. Detour in place. Starting August 23 at 11 am Estimated End Time is 2:00 PM on 08/23/14
Construction SR-342Blasting There is construction (Blasting) on SR-342 in both directions in Storey County Nevada. Road closed for blasting and flaggers will be present. August 21 at 1:30 pm. Estimated End Time is 2:00 PM on 08/21/14
Construction SR-342Blasting There is construction (Blasting, Stopped Traffic, Traffic Being Held) on SR-342 in both directions in Storey County Nevada. Road closure with flaggers for blasting. Traffic control by flaggers. Expect 30 min delay. Consider alternate route. Estimated End Time is 2:00 PM on 07/28/14
Construction SR-431Roadwork There is construction (Roadwork, Minor Delays) on SR-431 in both directions from Mount Rose Summit to South Virginia / US-395 Alternate in Washoe County Nevada. There will be various lane closures in the four lane section and single lane with flaggers and pilot vehicles in the two lane section. Motorist may expect delays up to 30 minutes and work is continuous Sunday night 7 PM thru Friday night 7 PM. This is an ongoing project expected to continue through September. Estimated End Time is 7:00 PM on 08/22/14
Special Event SR-447Minor Delays There is a special event (Minor Delays, Congestion) on SR-447 in both directions in Washoe County Nevada. 10mph speed reduction at traffic contoled areas of Gerlach and Empire. Flaggers will be present Estimated End Time is 12:00 AM on 09/03/14
Construction SR-535Overnight Roadwork There is construction (Overnight Roadwork) on SR-535 in both directions with right turn lane closed, flaggers, lanes reduced to 1, speed limit 35mph, width limit 14ft, from West Elko exit 298 to Idaho St., nightly, Sunday through Thursday, 7pm to 6 am in Elko, Elko County Nevada. Estimated End Time is 12:00 AM on 10/31/14.
Construction SR-599 Rancho Drive (Southern)Roadwork Project #73517 - There is construction (Roadwork, Minor Delays) on SR-599 Rancho Drive (Southern) in both directions from Sahara Ave to Rainbow Boulevard in Las Vegas, Clark County Nevada. Estimated End Time is 11:59 PM on 11/11/14
Construction SR-612 Nellis BlvdRoadwork Roadwork, Minor Delays on SR-612 Nellis Blvd from Sahara to the pedestrian Bridge in Las Vegas, Clark County Nevada; one lane will be closed beginning June 21st and continuing until early September. Please use caution in the area and expect delays.
Construction SR-667Roadwork There is construction (Roadwork) on SR-667 West in Reno, Washoe County Nevada. Kietzke ln and 2nd street. Right lane closed stay left. Work is Monday through Friday 7am to 3:30 pm Estimated End Time is 3:30 PM on 08/28/14
Construction SR-757Roadwork There is construction (Roadwork) on SR-757 West in Douglas County Nevada. CLOSURE OF WESTBOUND LANE, WITH FLAGGERS. Estimated End Time is 5:00 PM on 08/22/14
Construction US-395Overnight Roadwork There is construction (Overnight Roadwork) on US-395 near the Indian Colony in Douglas County Nevada. Right Lane And Shoulder by flaggers. US395 South of Gardnerville at Indian Colony, trench and widening on both sides for construction of turn lanes. Nightly work 8p-5a, Sunday Night thru Friday Morning. Single Lane Flagger and/or Pilot Car operations - one lane each direction during daytime. Maximum Delay 30 minutes possible. Estimated End Time is 5:00 AM on 09/06/14
Construction US-395Overnight Roadwork There is construction (Overnight Roadwork) on US-395 in both directions in Washoe County Nevada. Oddie on and off ramps closed with detour in place. Starting August 17 at 7:30 PM. Estimated End Time is 3:30 PM on 08/28/14
Construction US-395Utility Work There is construction (Utility Work, Roadwork) on US-395 in both directions in Washoe County Nevada. SHOULDER WORK FOR INSTALLATION OF NEW GAS LINE. AUGUST 11 TILL NOVEMBER 11 MONDAY THRU FRIDAY 7AM TILL 3 30 PM. Estimated End Time is 3:30 PM on 11/11/14
Road Condition US-50Oversized Load There is a conditions related event (Oversized Load) convoy of three in the travel lane with pilot car on Thursday August 21st from junction SR-305 in Austin on US-50 East to junction SR-278 in Eureka in Nevada. Estimated End Time is 7:15 PM on 08/21/14
Construction US-50Roadwork There is construction (Roadwork) on US-50 at milepost 38 through milepost 48 in both directions with flaggers; routing to opposing lanes,Daily from 7 am to 4 pm in Eureka County Nevada. Estimated End Time 4 pm on August 21
Construction US-50Overnight Roadwork There is construction (Roadwork, Overnight Roadwork) on US-50 in both directions in Carson City County Nevada. Flaggers will be present, no passing and re-routing to opposing lanes. No oversized permits allowed. Starting August 17 at 1200pm Estimated End Time is 5:30 AM on 08/29/14
Construction US-6Roadwork There is construction (Roadwork) on US-6 in both directions with flaggers routing to opposing lanes from milepost 128 to milepost 132, daily from 7am until 3pm in Nye County Nevada. Estimated End Time is 3pm on August 21.
Construction US-93Roadwork There is construction (Roadwork) on US-93 in both directions with lanes reduced to 1, width limit 12 feet, travel delay up to 30 minutes; with pilot car, flaggers, traffic routed to opposing lane, no passing, from milepost 0 to milepost 11, Monday through Friday from 6am until 6pm, North of Lages Junction in Elko County. Estimated End Time is 6pm on August 29.
Construction US-95Overnight Roadwork (Overnight Roadwork, Minor Delays) on US-95 southbound, from Elkhorn Bridge to Clark County I-215 in Las Vegas, Clark County Nevada from 9pm to 6am excluding Saturdays until September 2015. Use caution around vehicles.
Construction US-95Utility Work There is construction (Utility Work) on US-95 South with lanes reduced to 1 at the Intersection of Hansen St. beginning at 7am on Thursday August 21 in Humboldt County Nevada. Estimated End Time is 5pm on August 21.
Construction US-95Roadwork There is construction (Roadwork) on US-95 in both directions with flaggers, pilot car, no passing, speed limit 55mph, and up to a 30 minute travel delay between milepost 2 and milepost 34 in Humboldt County, Nevada. Construction will be recurring Monday through Friday from 6:30am until 6pm.Estimated End Time is 6:00pm on September 2nd.
Construction US-95Roadwork Contract 3554: Roadwork, Minor Delays on US-95 in both directions from Ann Road to Durango in Las Vegas, Clark County Nevada; project set to begin April 2014 and continue until late 2015. Use caution in the area.

Data Source: Nevada Department of Transportation (NDOT)

NDOT provides the above traveler information as a public service. This information is published automatically and cannot be guaranteed as to accuracy or timeliness. This information depends on a number of items, including Internet availability, communications networks, and computer equipment which are beyond the control of the NDOT and difficult to predict.

Listing of roadway snow and ice conditions is not a guarantee that NDOT has plowed or sanded all of these locations for travelers. Plowing and sanding is generally done to different roads on a basic priority system but that the actual determination of the amount and timing of sanding and plowing of any particular section of highway is up to the judgment of local road maintenance officials based on their experience and local conditions at particular times.

Weather and road conditions change rapidly, and drivers are in the best position to perceive such conditions and adjust their driving accordingly. It is alwyas a good idea to drive prepared. This might include traveling with snow chains, and extra food, water and clothing. Those relying on the foregoing information do so at their own risk, and neither the State of Nevada, the NDOT nor any of their employees or agents shall, nor MtCharlestonWeather.com be liable for either the accuracy of this information nor any actions taken in reliance thereon.

SHOW
    • Get the Forecast via Email
    • Like Us On Facebook
    • Follow Us On Twitter
    • Follow Us On Google+
    • View Us On YouTube
    • Subscribe to RSS Feed
    • Feel Free to Contact Us