Heat Advisory
Click for Details

Mt. Charleston Weather

Current Weather, Forecast, and Live Webcam for Mount Charleston, NV

Current Mt. Charleston Road Conditions, Advisories, and Snow Chain Requirements

Last Updated on 10:54:44 June 21, 2018.
SR 156 - Lee Canyon Road: OPEN

SR 157 - Kyle Canyon Road: OPEN

SR 158 - Deer Creek Road: OPEN

Weather  Weather Related ...Fire Weather Watch for portions of the Valley and Surrounding Foothills this Weekend... .Surface high pressure building into Oregon Saturday morning behind a passing upper-level low pressure system will result in dry and gusty northerly winds over portions of the northern Central Valley and surrounding Foothills this weekend. More Details
Current as of: 6/21/2018 4:59:00 AM PDT
Weather  Weather Related ...Excessive Heat Possible Late This Week... .Strong high pressure will build into Northern California late this week bringing a period of hot temperatures across the region. Much of the Central Valley and portions of the foothills are likely to top 100 degrees Friday through Sunday. There is potential for heat-related illness to humans, pets, and livestock More Details
Current as of: 6/21/2018 3:30:00 AM PDT
Weather  Weather Related ...EXCESSIVE HEAT WARNING REMAINS IN EFFECT FROM 11 AM THIS MORNING TO 8 PM PDT FRIDAY... * High Temperatures...102 to 108. * Impacts...An Excessive Heat Warning means that a prolonged period of heat will create a dangerous situation in which heat illnesses are possible. More Details
Current as of: 6/21/2018 2:37:00 AM PDT
Weather  Weather Related ...RED FLAG WARNING REMAINS IN EFFECT FROM NOON TODAY TO MIDNIGHT MDT TONIGHT FOR WIND AND LOW RELATIVE HUMIDITY FOR FIRE WEATHER ZONES 495...496...497 AND 498... * AFFECTED AREA...Fire Weather Zone 495 Color Country West Desert...Fire Weather Zone 496 Color Country Mountains...Fire Weather Zone 497 Mojave Desert and Fire Weather Zone 498 Grand More Details
Current as of: 6/21/2018 2:27:00 AM PDT
Weather  Weather Related ...EXCESSIVE HEAT WARNING REMAINS IN EFFECT FROM 11 AM PDT /11 AM MST/ THIS MORNING TO 8 PM PDT /8 PM MST/ SATURDAY... * TEMPERATURE...The hottest days are expected to be Thursday and Friday with the Las Vegas Valley and Pahrump...potentially reaching 110 to 115 degrees...115 to 120 along the Colorado River Valley, and 120 to 125 degrees in Death Valley. More Details
Current as of: 6/21/2018 1:33:00 AM PDT
Weather  Weather Related ...HEAT ADVISORY REMAINS IN EFFECT FROM 11 AM THIS MORNING TO 8 PM PDT SATURDAY... * TEMPERATURE...High temperatures ranging from the mid 80s to mid 90s. * IMPACTS...Heat related illnesses such as heat exhaustion and heat stroke will be possible. Limit outdoor activity, More Details
Current as of: 6/21/2018 1:33:00 AM PDT
Weather  Weather Related ...EXCESSIVE HEAT WARNING REMAINS IN EFFECT FROM 11 AM PDT /11 AM MST/ THIS MORNING TO 8 PM PDT /8 PM MST/ SATURDAY... * TEMPERATURE...The hottest days are expected to be Thursday and Friday with the Las Vegas Valley and Pahrump...potentially reaching 110 to 115 degrees...115 to 120 along the Colorado River Valley, and 120 to 125 degrees in Death Valley. More Details
Current as of: 6/21/2018 1:33:00 AM PDT
Weather  Weather Related ...HEAT ADVISORY REMAINS IN EFFECT FROM 11 AM THIS MORNING TO 8 PM PDT SATURDAY... * TEMPERATURE...High temperatures ranging from the mid 80s to mid 90s. * IMPACTS...Heat related illnesses such as heat exhaustion and heat stroke will be possible. Limit outdoor activity, More Details
Current as of: 6/21/2018 1:33:00 AM PDT
Weather  Weather Related ...EXCESSIVE HEAT WARNING REMAINS IN EFFECT FROM 11 AM PDT /11 AM MST/ THIS MORNING TO 8 PM PDT /8 PM MST/ SATURDAY... * TEMPERATURE...The hottest days are expected to be Thursday and Friday with the Las Vegas Valley and Pahrump...potentially reaching 110 to 115 degrees...115 to 120 along the Colorado River Valley, and 120 to 125 degrees in Death Valley. More Details
Current as of: 6/21/2018 1:33:00 AM PDT
Construction Galletti WayRoadwork Roadwork (Road Closed) - on Galletti Way in both directions at East 4th Street in Sparks Nevada.
Current as of: 6/18/2018 4:38:50 PM PDT
Incident I-15Abandoned Vehicle Abandoned Vehicle - on I-15 northbound north of Lake Mead Boulevard in North Las Vegas, Clark County Nevada. Right shoulder blocked; use caution.
Current as of: 6/20/2018 6:37:18 AM PDT
Construction I-15Overnight Roadwork Overnight Roadwork - on I-15 southbound from SR-147/Lake Mead Blvd westbound in North Las Vegas, Clark County Nevada. The on ramp will be closed due to road improvements. Seek alternate routes from 9pm, June 24th, to 6am, June 25th.
Current as of: 6/15/2018 11:33:02 PM PDT
Construction I-15Overnight Roadwork Overnight Roadwork - on I-15 southbound on ramp from Sahara Ave in Las Vegas, Clark County Nevada with ongoing nightly intermittent reduced lanes from 7pm until 6am through June 22nd. Use caution around this area.
Current as of: 6/10/2018 2:35:06 AM PDT
Construction I-15Roadwork Roadwork - on I-15 southbound Charleston on-ramp will be closed 24/7 from 9 p.m., February 19th, through mid October 2018 as part of Project Neon. Please seek alternate routes in Las Vegas, Clark County Nevada.
Current as of: 6/5/2018 3:46:35 AM PDT
Construction I-15Roadwork Roadwork - on I-15 southbound on-ramp from MLK will remain closed from March 4, 2018 until early 2019. Due to continued Project Neon roadwork. Please seek alternate routes in Las Vegas, Clark County Nevada.
Current as of: 5/22/2018 11:36:24 PM PDT
Construction I-15Overnight Roadwork Overnight Roadwork - on I-15 northbound off ramp to MLK Blvd with ongoing nightly intermittent closures, Monday to Saturday from 9pm to 6am until mid-July due to continued Project Neon construction. Use other route and caution around this area in Las Vegas, Clark County Nevada.
Current as of: 5/19/2018 1:44:02 AM PDT
Construction I-15Roadwork Roadwork - on I-15 in both directions between Sahara and D st - lanes will be reduced from 4 a.m., March 6th, until 7 a.m., November 20th. Due to continued Project Neon roadwork. Use caution around work area and seek alternate routes in Las Vegas, Clark County Nevada.
Current as of: 5/13/2018 2:25:08 AM PDT
Construction I-15Overnight Roadwork Overnight Roadwork - on I-15 in both directions between Flamingo Rd and Sahara Ave with 24/7 reduced lanes until late August due to continued Project Neon construction. Please use caution around this area in Las Vegas, Clark County Nevada.
Current as of: 5/12/2018 10:32:17 PM PDT
Construction I-15Roadwork Roadwork - on I-15 in both directions between US-95 and Craig Rd with lane restrictions until late August 2018 due to road improvements. Use caution around this area in Las Vegas, Clark County Nevada.
Current as of: 5/6/2018 12:17:25 AM PDT
Construction I-15Roadwork Roadwork - on I-15 southbound between Cactus Avenue and St. Rose Parkway - will have a temporary realign at Starr Ave onto a temporary 3 lane detour road from 8 p.m., April 5, for 12 months. Roadwork is needed due to the new interstate 15 Starr Avenue interchange. Please use caution around work area in Las Vegas, Clark County Nevada.
Current as of: 4/5/2018 2:25:49 AM PDT
Construction I-15Roadwork Roadwork - on I-15 in both directions between D Street and Alta Dr. will have 24/7 reduced lanes from 5 a.m., March 8th until November 20th. Due to continued Project Neon roadwork. Use caution around work area and seek alternate routes in Las Vegas, Clark County Nevada.
Current as of: 3/23/2018 11:54:08 PM PDT
Construction I-15Roadwork Roadwork - on I-15 southbound on-ramp from D Street will be closed 247 starting 9 p.m., March 7th until mid July 2018. ~Due to continued Project Neon roadwork. Please seek alternate routes in Las Vegas, Clark County Nevada.
Current as of: 3/2/2018 5:46:00 AM PST
Construction I-15Roadwork Roadwork - on I-15 northbound from Martin Luther King Blvd - on ramp closed from 7pm, August 14th thru July 2018 for construction of flyover ramp as part of Project Neon. Use other routes in Las Vegas, Clark County Nevada.
Current as of: 12/23/2017 8:28:04 PM PST
Road Condition I-15Oversized Load Oversized Load - on I-15 a convoy of 3 moving through the area from the AZ/NV State Line to the NV/CA State Line Use caution around slow-moving vehicles with pilot car escort in Las Vegas, Clark County Nevada. Thursday, June 21, and Friday June 22nd- during daylight hours
Current as of: 6/20/2018 2:32:08 AM PDT
Construction I-80Roadwork Roadwork (Minor Delays) - on I-80 in both directions Boomtown Garson Exit 3 and East Verdi Exit 5 in Reno Nevada. Left lane closed 8 A M to 4 P M. Eastbound on Wednesday, Westbound on Thursday. Estimated End Time is 4:00 PM on 06/22/18
Current as of: 6/20/2018 12:17:14 PM PDT
Construction I-80Roadwork Roadwork (Minor Delays) - on I-80 at I-80 Exit 23 - Mustang in Washoe County Nevada. Various lane closures on frontage roads as well as intermediate ramp closures on Eastbound and Westbound I-80 on-ramps from 7 A M to 3:30 P M, Monday through Friday. Detours in place. Estimated End Time is Fri Jun 29 15:30:00 PDT 2018 on 06/29/18
Current as of: 6/18/2018 10:45:08 AM PDT
Construction I-80Roadwork Roadwork (Minor Delays) - on I-80 West from West McCarran Boulevard to Robb Drive in Reno Nevada. Single lane closure from 7 A M to 7 P M, Monday through Friday. Estimated End date is 08/03/18
Current as of: 6/18/2018 10:43:54 AM PDT
Construction I-80Roadwork Roadwork - on I-80 Both Directions between Exit 173 - West Winnemuca Blvd and just east of Exit 180 - East Winnemucca Blvd SR 794 in Winnemucca Nevada. Lanes are reduced to one and speed limit to 55 miles per hour, with no passing. Exit 176 (Winnemucca Downtown West, US 95) is closed, please use exit 178 (Winnemucca Downtown East, SR 289); or 173 as a detour. Estimated End Time is Fri Jun 29 19:00:00 PDT 2018 on 06/29/18
Current as of: 6/12/2018 1:36:45 PM PDT
Construction I-80Roadwork Roadwork - on I-80 in both directions from West Carlin to Carlin Tunnels in Elko County Nevada. Daily work between mile posts 279 and 285, lanes are reduced to one with speed limit of 55 miles per hour, No Passing, and 16 foot Width limit. Stay alert and Use Caution. Estimated End date is 09/30/18
Current as of: 6/10/2018 10:27:18 AM PDT
Construction I-80Utility Work Utility Work - on I-80 in both directions at Valmy Rest Area in Valmy Nevada. Rest Area Closed until further notice. Estimated End Time is Fri Jun 22 20:00:00 PDT 2018 on 06/22/18
Current as of: 6/10/2018 10:26:48 AM PDT
Construction I-80Roadwork Roadwork - on I-80 in both directions between Exit 376 - Pequop and Exit 365 in Elko County Nevada. Daily from 5 a m to 7 p m; mile marker 367 to mile marker 375. Lanes reduced to one with the speed limit reduced to 55 mph. Stay alert and drive with care. Estimated End date is 08/03/18
Current as of: 6/5/2018 3:59:50 PM PDT
Construction I-80Roadwork Roadwork - on I-80 East between Valmy Rest Area and 2 miles east of Exit 222 - Mote in Valmy Nevada. Lanes reduced to one. Speed limit reduced to 55 Miles Per Hour with no passing. Estimated End Time is Fri Jun 29 19:00:00 PDT 2018 on 06/29/18
Current as of: 6/5/2018 3:59:22 PM PDT
Construction I-80Overnight Roadwork Overnight Roadwork (Minor Delays) - on I-80 West at I-80 Exit 12 - Keystone Ave in Reno Nevada. Intermittent off-ramp closure between 9 PM to 5 AM. Estimated End Time is Tue Jul 03 05:00:00 PDT 2018 on 07/03/18
Current as of: 6/2/2018 9:40:06 PM PDT
Construction I-80Roadwork Roadwork - on I-80 in both directions between Exit 268 - Emigrant Exit 261 - SR 306 Beowawe Crescent Valley in Eureka County Nevada. Daily between 6AM to 6PM with reduced lanes; Speed limit 55 Miles Per Hour; No Passing. Stay alert and drive with care. Estimated End date is 09/30/18
Current as of: 6/1/2018 8:21:15 AM PDT
Construction I-80Overnight Roadwork Overnight Roadwork (Minor Delays) - on I-80 West at Keystone Avenue in Reno Nevada. Keystone On Ramp closed from 9 PM to 5 AM, Sunday through Friday. Estimated End date is 07/03/18
Current as of: 5/28/2018 3:45:18 AM PDT
Construction I-80Overnight Roadwork Overnight Roadwork (Minor Delays) - on I-80 East from Robb Drive to Keystone Avenue in Reno Nevada. Single lane closure from 7 PM to 6 AM, Sunday through Thursday. Estimated End date is 07/03/18
Current as of: 5/22/2018 4:59:28 PM PDT
Construction I-80Overnight Roadwork Overnight Roadwork (Minor Delays) - on I-80 West from McCarran Boulevard to Robb Drive in Reno Nevada. Single lane closure from 7 PM to 7 AM, Sunday through Friday. Estimated End date is 11/30/18
Current as of: 5/19/2018 5:07:42 PM PDT
Construction Martin Luther King Blvd Overnight Roadwork Overnight Roadwork - on Martin Luther King Blvd southbound at US-95 with lane restrictions in Las Vegas, Clark County Nevada nightly from 7pm until 6am through June 25th. Use caution around this area.
Current as of: 6/10/2018 1:34:15 AM PDT
Construction Oakey BlvdRoadwork Roadwork - on Oakey Blvd in both directions between Kiltie Way and Western Ave with 24/7 reduced lanes, and additional lane restrictions daily from 6am to 4pm, as well as nightly from 7pm to 6am until mid-July due to continued Project Neon construction. Please use caution around this area in Las Vegas, Clark County Nevada.
Current as of: 4/21/2018 11:45:50 PM PDT
Construction SR-140Roadwork Roadwork -Maintenance work on the shoulder on SR-140 in both directions from MM30 to MM45 in Humboldt County Nevada. Use Caution. Estimated End Time is Thursday, June 21, 2018 at 4:30 PM.
Current as of: 6/18/2018 12:49:43 PM PDT
Construction SR-159/Charleston BlvdUtility Work Utility Work - on SR-159/Charleston Blvd in both directions between Honolulu St and Lamb Blvd in Las Vegas, Clark County Nevada for the City of Las Vegas sewer rehabilitation. Use caution around this area Monday through Friday, 7am until 6pm until February 2019 with occasional overnight work from 9pm until 5am.
Current as of: 5/27/2018 4:59:49 AM PDT
Construction SR-159/Charleston BlvdOvernight Roadwork Overnight Roadwork - on SR-159/Charleston Blvd in both directions between Shadow Ln and I-15 with nightly lane restrictions from 7pm to 6am, April 18th until June 23rd due to continued Project Neon construction. Use caution around this area in Las Vegas, Clark County Nevada.
Current as of: 5/26/2018 11:46:22 PM PDT
Construction SR-207Roadwork Roadwork (Minor Delays) - on SR-207 in both directions between US-50 and SR-206 in Douglas County Nevada. Weekdays, 6/11 thru 6/22 from 7 AM to 5 PM, traffic will be reduced to one lane with flagger and pilot car control. The work zone width limit will be 12 feet. Expect delays up to 30 minutes.
Current as of: 6/7/2018 11:05:57 PM PDT
Construction SR-221Utility Work Utility Work - on SR-221 in both directions at 10th Street in Carlin, Elko County Nevada. Daily from 7 AM to 6 PM. Use caution uneven lanes. Estimated End Time is Fri Jun 29 at 6PM.
Current as of: 6/15/2018 1:52:58 PM PDT
Construction SR-227Roadwork Roadwork - Beginning Daily, Monday through Friday, on SR-227 Southbouth from milepost 2 to milepost 3; Adjacent to the Roadway; in Elko County Nevada. Estimated End Time is Fri Jul 20 at 7PM.
Current as of: 6/19/2018 7:25:34 AM PDT
Construction SR-278Roadwork Roadwork (Major Delays) - on SR-278 in both directions between milepost 54 and milepost 65 in Eureka County Nevada. Daily from 6:00 AM to 6:00 PM; Expect travel delay of 30 minutes with the speed limit reduced to 55 Miles Per Hour, No passing, and 12 foot Width limit. Stay alert for flaggers and pilot cars. Estimated End Time is Sat Jun 30 18:00:00 PDT 2018 on 06/30/18
Current as of: 6/5/2018 4:07:44 PM PDT
Construction SR-278Rough Road Rough Road (Major Delays) - on SR-278 in both directions between mile marker 65 and mile marker 35 in Eureka County Nevada. Speed reduced to 55 miles per hour from 24 miles south of Carlin and 35 miles north of US-50. Stay alert and drive with care.
Current as of: 5/7/2018 8:41:19 AM PDT
Construction SR-28Roadwork Roadwork - on SR-28 in both directions from US-50 to Sweetwater Road in Nevada. Various lane closures with pilot cars and flaggers daily. Estimated End date is 10/20/18
Current as of: 5/3/2018 3:34:39 PM PDT
Construction SR-318Roadwork Roadwork - on SR-318 in both directions from Milepost 20 to Milepost 22; Flaggers; Pilot Car; Lanes Reduced To One; Expect Delays; Use Caution; in Nye County Nevada. Estimated End Time June 21 at 5:00 PM
Current as of: 6/21/2018 7:56:02 AM PDT
Construction SR-341Roadwork Roadwork (Minor Delays) - on SR-341 in both directions between Calavaras Road and Cartwright Road in Storey County Nevada. Single traffic with flaggers, maintenance. Estimated End Time is 3:30 PM
Current as of: 6/21/2018 8:25:42 AM PDT
Construction SR-341Overnight Roadwork Overnight Roadwork - on SR-341 in both directions in Nevada. SR-341 The Contractor will single lane traffic at 6.14ST to change out an old Power pole. Flaggers will be in place and expect minor delays. Estimated End Time is 5:30 AM on 06/22/18
Current as of: 6/20/2018 10:25:55 AM PDT
Construction SR-439Overnight Roadwork Overnight Roadwork (Minor Delays) - on SR-439 in both directions in Nevada. At Waltham Way and the Westbound I-80 off ramp. Work will be continuous from 4/28 to 8/31. Right turn only on both Electric Ave and Britain Drive. Detours will be in place. Estimated End date is 08/31/18
Current as of: 4/27/2018 10:51:00 PM PDT
Incident SR-579/Bonanza RdRoadwork Roadwork - on SR-579/Bonanza Rd in Las Vegas, Clark County Nevada. Reduced lanes from Main Street to D street due to overhead bridge repairs. Use caution and expect delays from 8am to 2pm, June 21st.
Current as of: 6/18/2018 11:50:52 PM PDT
Construction SR-612/Nellis BlvdRoadwork Roadwork - on SR-612/Nellis Blvd in both directions between SR-574/Cheyenne Ave and SR-604/Las Vegas Blvd with daily lane restrictions from 6am until 3:30pm, Mon - Fri, August 9, 2017 through July 2018 due to sanitary sewer improvements. Please use caution around this area in Las Vegas, Clark County Nevada.
Current as of: 5/22/2018 11:31:42 PM PDT
Construction SR-647Utility Work Utility Work - on SR-647 in Nevada. SR647 (West Fourth Street) The Contractor will be installing utility poles at 2.75WA. Flaggers will be in place. Expect minor delays. Estimated End Time is Fri Jun 22 15:30:00 PDT 2018 on 06/22/18
Current as of: 6/19/2018 8:06:09 AM PDT
Construction SR-757Road Closed Road Closed (Bridge Work) - on SR-757 in both directions from SR-206 to US-395 in Douglas County Nevada. Local traffic only. Estimated End date is 08/21/18
Current as of: 4/20/2018 1:44:28 PM PDT
Construction SR-789Roadwork Roadwork - (Railroad Work) on SR-789 in both directions at Milepost 6.60; Flaggers; Lanes Reduced To One; No Passing; 24 Hour Operation; in Humboldt County Nevada. Estimated End Time is Thu Jun 21 at 7PM.
Current as of: 6/19/2018 7:32:00 AM PDT
Construction SR-789Roadwork Roadwork - on SR-789 in both directions north of Golconda between milepost 6 and milepost 7 in Humboldt County Nevada. Beginning on June 18th and will be daily at 6 AM to 4:30 PM with flaggers; routing to opposing lanes ; Use Caution Estimated End Time is Fri Jun 22 16:30:00 PDT 2018 on 06/22/18
Current as of: 6/12/2018 2:46:16 PM PDT
Construction SR-894Roadwork Roadwork - Beginning Daily on Monday, June 25 at 6AM on SR-894 in both directions from Milepost 0 to Milepost 16; Pilot Car; Flaggers: Lanes Reduced To One; No Passing; Local Traffic Only; Expect Minor Delays; in White Pine County Nevada. Estimated End Time is 5:30 PM on 06/28/18
Current as of: 6/21/2018 9:57:21 AM PDT
Construction US-395Overnight Roadwork Overnight Roadwork (Minor Delays) - on US-395 North at Parr in Reno Nevada. Northbound off-ramp left turn lane closed from 9 P M to 5 A M, Wednesday through Friday. Estimated End Time is 5:00 AM on 06/22/18
Current as of: 6/19/2018 1:29:58 PM PDT
Construction US-395Overnight Roadwork Overnight Roadwork (Minor Delays) - on US-395 South from Parr Boulevard to McCarran Boulevard in Reno Nevada. Two right lanes closed from 8 P M to 5 A M, Sunday through Monday. Estimated End Time is Sat Jun 23 05:00:00 PDT 2018 on 06/23/18
Current as of: 6/18/2018 10:43:15 AM PDT
Construction US-395Overnight Roadwork Overnight Roadwork (Minor Delays) - on US-395 North from Glendale Avenue to Oddie Boulevard in Reno Nevada. Left lane closed from 8 P M to 5 A M, Monday through Saturday. Estimated End Time is Sat Jun 23 05:00:00 PDT 2018 on 06/23/18
Current as of: 6/18/2018 10:42:49 AM PDT
Construction US-395Overnight Roadwork Overnight Roadwork (Minor Delays) - on US-395 South from Oddie Boulevard to Glendale Avenue in Reno Nevada. Left lane closed from 8 P M to 5 A M, Monday through Saturday. Estimated End Time is Sat Jun 23 05:00:00 PDT 2018 on 06/23/18
Current as of: 6/18/2018 10:42:33 AM PDT
Construction US-395Roadwork Roadwork (Minor Delays) - on US-395 in both directions from Ironwood Drive to Stockyard Road in Douglas County Nevada. Traffic reduced to two southbound travel lanes and one northbound lane until June 30th. Estimated End Time is Sat Jun 30 18:30:00 PDT 2018 on 06/30/18
Current as of: 6/6/2018 11:41:22 AM PDT
Construction US-395ARoadwork Roadwork (Minor Delays) - on US-395A in both directions from Bowers Mansion to SR-431 in Washoe County Nevada. Single lane closure both directions from 6 A M to 8 P M, Monday through Friday. Estimated End Time is Fri Jun 22 20:00:00 PDT 2018 on 06/22/18
Current as of: 6/12/2018 2:18:05 PM PDT
Construction US-50Overnight Roadwork Overnight Roadwork (Minor Delays) - on US-50 South from Kahle Drive to 4th Road in Douglas County Nevada. Single lane closure southbound from 8 PM to 6:30 AM. Estimated End Time is 6:30 AM on 07/17/18
Current as of: 6/20/2018 12:42:49 PM PDT
Construction US-50Roadwork Roadwork (Major Delays) - on US-50 in both directions between Austin and Pass Miners Road in Lander County Nevada. Daily from 6 30 A M to 7 P M; Single lane traffic with pilot car, flaggers, no passing zone, and speed limit reduced to 55 miles per hour. Expect 30 minute travel delay. Stay alert and drive with care. Estimated End Time is Mon Jun 25 19:00:00 PDT 2018 on 06/25/18
Current as of: 6/11/2018 2:42:48 PM PDT
Construction US-50Roadwork Roadwork (Minor Delays) - on US-50 in both directions from Douglas County Mile Post 3 to Douglas County Mile Post 3.5 in Douglas County Nevada. Various lane closures from 7 AM to 5 PM, Monday through Friday. Estimated End date is 07/06/18
Current as of: 6/2/2018 9:39:38 PM PDT
Construction US-50Roadwork Roadwork (Minor Delays) - on US-50 in both directions from Casey Road to Maine Street in Churchill County Nevada. Various lane closures from 7 AM to 3:30 PM. Estimated End date is 07/27/18
Current as of: 5/28/2018 3:46:38 AM PDT
Construction US-50Roadwork Roadwork (Minor Delays) - on US-50 in both directions from Logan Creek Road to Sweetland Road in Douglas County Nevada. Single lane traffic with flaggers.
Current as of: 5/6/2018 9:06:29 AM PDT
Construction US-50Roadwork Roadwork (Minor Delays) - on US-50 in both directions around SR-28 in Douglas County Nevada. Intermittent flaggers for heavy vehicle movement. Estimated End date is 10/20/18
Current as of: 4/28/2018 1:17:20 PM PDT
Construction US-50AMoving Roadwork Moving Roadwork - on US-50A in both directions Lyon Churchill County line to US-50 Leetville Junction in Churchill County Nevada. Weed abatement on shoulders, slow vehlicles. Estimated End Time is 3:30 PM
Current as of: 6/21/2018 9:47:18 AM PDT
Construction US-50ARoadwork Roadwork (Minor Delays) - on US-50A East from Hardie Lane to 7th Street in Lyon County Nevada. Right lane closed from 6:30 AM to 4 P M, Monday through Friday. Estimated End date is 08/24/18
Current as of: 6/18/2018 10:44:40 AM PDT
Construction US-6Utility Work Utility Work - on US-6 at Milepost 25 in Nye County Nevada. The Salisbury Rest Park is Closed from June 20th at 9am to 12pm June 21st for improvements. Please adjust travel plans accordingly.
Current as of: 6/20/2018 6:51:04 AM PDT
Road Condition US-6, SR-360, US-95, US-50, ALT US-50, ALT US-95, SR-427 & SR-447Oversized Load Oversized Load - on US-6, SR-360, US-95, US-50, ALT US-50, ALT US-95, SR-427 & SR-447 North from the California Border to Gerlach in Nevada. Thursday and Friday, daylight hours only. Stay alert for pilot cars and an NHP escort. Estimated End Time is 9:00 PM on 06/22/18
Current as of: 6/20/2018 10:20:36 PM PDT
Road Condition US-6; SR-360; US-95, Oversized Load Oversized Load - on US-6; SR-360; US-95, moving thru the area from the CA/NV State-line to SR-447. Use caution around slow-moving vehicles with pilot car escort in Mina, Mineral County Nevada. Thursday June 21st, and Friday June 22nd, during daylight hours
Current as of: 6/20/2018 3:41:12 AM PDT
Construction US-93Roadwork Roadwork -During the daylight hours on US93 in both directions in White Pine County in Nevada. Traffic will be routed to opposing lanes and no oversized permits permitted. Estimated End Time is 7:00 PM on 06/29/18
Current as of: 6/20/2018 5:13:10 AM PDT
Construction US-93Roadwork Roadwork with Minor Delays - on US-93 in both directions between I-15 and Apex Power Parkway with a 24/7 flagging operation and lane restrictions beginning Feb 1st through June 2018 due to lane widening and road improvements. Please use caution around flaggers in this area in North Las Vegas, Clark County Nevada.
Current as of: 2/18/2018 10:04:24 PM PST
Construction US-93Roadwork Roadwork (Minor Delays) - on US-93 in both directions from Foothills Drive to Silverline Road; expect traffic delays and use alternate routes if available in Boulder City, Clark County Nevada.
Current as of: 2/18/2018 7:08:03 PM PST
Construction US-95Roadwork Roadwork - on US-95 southbound on ramp from eastbound Durango Dr in Las Vegas, Clark County Nevada closed 24/7 from 9pm, June 15th until 5am, June 25th for the installation of storm drainage. Use other routes.
Current as of: 6/11/2018 9:58:09 PM PDT
Construction US-95Overnight Roadwork Overnight Roadwork - on US-95 in both directions between Southern Rancho and I-15 in Las Vegas, Clark County Nevada with nightly reduced lanes from 7pm until 6am, June 11th through June 28th. Use caution and expect delays in this area.
Current as of: 6/10/2018 1:56:43 AM PDT
Construction US-95Overnight Roadwork Overnight Roadwork - on US-95 northbound off ramp to MLK Blvd will be closed intermittently in Las Vegas, Clark County Nevada at night from 7pm until 6am, June 18th until mid-July due to continued Project Neon construction. Use other routes and caution in this area.
Current as of: 6/10/2018 1:22:58 AM PDT
Construction US-95Roadwork Roadwork - on US-95 between the California/Nevada State-line and Loran Station Rd with daily road improvements thru November 2018. Use caution around this area in Cal-Nev-Ari, Clark County Nevada.
Current as of: 5/28/2018 1:00:36 AM PDT
Construction US-95Roadwork Roadwork - on US-95 southbound at I-15 - will have reduced lanes 24/7 starting 7 p.m., March 16th, for the next few months due to continued Project Neon roadwork. Please use caution around work area in Las Vegas, Clark County Nevada.
Current as of: 4/25/2018 11:46:25 PM PDT
Construction US-95Overnight Roadwork Overnight Roadwork - on US-95 in both directions between Northern I-215 and Durango Dr with nightly reduced lanes for continued road improvements in Las Vegas, Clark County Nevada. Use caution from 9pm until 5am, April 24th through October 31st, lanes will be reduced to 24' in each direction with a 17' vertical restriction, also between 11pm and 5am be prepared for up to a 30 minute long intermittent traffic stop.
Current as of: 4/23/2018 9:26:40 PM PDT
Construction US-95Roadwork Roadwork - on US-95 in both directions between Mile Marker 95 (Skye Canyon Park Dr) and Mile Marker 98 (Snow Mountain) with 24/7 reduced lanes and a total lane width of 14' from Jan 10th 2018 until July 12th 2019 for road improvements. Please use caution around this area in Las Vegas, Clark County Nevada.
Current as of: 3/27/2018 3:14:28 AM PDT
Construction US-95Roadwork Roadwork - on US-95 in both directions at the Elkhorn Rd overpass (before northern Durango Dr) with reduced lanes northbound from 9pm, March 19th and southbound from 9pm, March 20th through December 2018 due to the construction of an HOV ramp. Use caution around this area in Las Vegas, Clark County Nevada.
Current as of: 3/16/2018 9:00:07 PM PDT
Construction US-95Roadwork Roadwork - on US-95 southbound to go I-15 southbound will be reduced to 1 lane and detoured from midnight March 4th, until late December 2018; due to continued Project Neon roadwork. Please use caution around work area, expect delays and seek alternate routes in Las Vegas, Clark County Nevada.
Current as of: 3/7/2018 6:58:38 PM PST
Construction US-95Roadwork Roadwork - on US-95 in both directions with continued lane restriction until October due to the continued I-11 construction. Please use caution around this area in Boulder City, Clark County Nevada.
Current as of: 3/3/2018 2:51:39 AM PST
Construction US-95Roadwork Roadwork - on US-95 southbound on-ramp from MLK will remain closed from March 4th until early 2019. Due to continued Project Neon roadwork. Please seek alternate routes in Las Vegas, Clark County Nevada.
Current as of: 3/2/2018 6:21:10 AM PST
Construction US-95Roadwork Roadwork - on US-95 southbound off ramp to northbound I-15 with ongoing 24/7 closure until Late 2018 due to continued Project Neon construction. Use other routes in Las Vegas, Clark County Nevada.
Current as of: 1/6/2018 10:20:55 PM PST
Construction US-95ARoadwork Roadwork (Minor Delays) - on US-95A in both directions between the Wabuska RR Crossing and Goldfield Ave in Lyon County Nevada. Weekdays, 6/12 thru 6/22 from 6 AM to 7 PM, traffic will be reduced to one lane with flagger and pilot car control.
Current as of: 6/7/2018 10:48:31 PM PDT
Construction West Idaho StUtility Work Utility Work - on West Idaho St between I-80 and West Airport Road in Elko County Nevada. Daily at 7 AM to 5 PM Monday through Friday on the north shoulder of the road. Use Caution Estimated End date is 11/01/18
Current as of: 4/25/2018 11:54:23 AM PDT

Data Source: Nevada Department of Transportation (NDOT)

NDOT provides the above traveler information as a public service. This information is published automatically and cannot be guaranteed as to accuracy or timeliness. This information depends on a number of items, including Internet availability, communications networks, and computer equipment which are beyond the control of the NDOT and difficult to predict.

Listing of roadway snow and ice conditions is not a guarantee that NDOT has plowed or sanded all of these locations for travelers. Plowing and sanding is generally done to different roads on a basic priority system but that the actual determination of the amount and timing of sanding and plowing of any particular section of highway is up to the judgment of local road maintenance officials based on their experience and local conditions at particular times.

Weather and road conditions change rapidly, and drivers are in the best position to perceive such conditions and adjust their driving accordingly. It is alwyas a good idea to drive prepared. This might include traveling with snow chains, and extra food, water and clothing. Those relying on the foregoing information do so at their own risk, and neither the State of Nevada, the NDOT nor any of their employees or agents shall, nor MtCharlestonWeather.com be liable for either the accuracy of this information nor any actions taken in reliance thereon.

SHOW
    • Get the Forecast via Email
    • Like Us On Facebook
    • Follow Us On Twitter
    • Follow Us On Google+
    • View Us On YouTube
    • Subscribe to RSS Feed
    • Feel Free to Contact Us